Swipe or scroll through the photos. Select a photo to enlarge it.
Bathroom tile work with new shower glass doors.Floor tile detail at the glass shower enclosure.Vanity and tile detail from the Spring Hill bathroom project.
Before-and-finished photos from this September 2026 kitchen project show the wall preparation and the new blue-gray tile around the counters, sink and stove.
Swipe or scroll through the photos. Select a photo to enlarge it.
Before: old backsplash removed around the counters.Before: wall prep after the previous backsplash was removed.Finished: blue-gray backsplash tile installed around the sink and counters.Finished: backsplash tile continuing behind the stove and microwave.
This Hudson project replaced an old brown floor with a finished gray plank-look floor. The photos show the original floor, preparation and completed room.
Opened floor areas were repaired with plywood patches, then the original linoleum was carefully returned over the repairs. See the before, repair-stage and finished views.
Swipe or scroll through the photos. Select a photo to enlarge it.
Before: opened floor beside the RV bed, showing the exposed subfloor area.Before: window-side floor opened, with the existing linoleum rolled back.Repair stage: plywood patch installed beside the bed.Repair stage: window-side plywood patch installed before the linoleum was returned.Finishing stage: existing linoleum returned beside the bed; temporary weights remain in place.Finishing stage: existing linoleum laid back over the repaired area, with tools and temporary weights still present.After: finished RV floor in Homosassa, reusing the existing linoleum for a clean, nearly seamless finish.